Toll Logistics Government & Defence Accommodation Camp Project: Rapid Deployment in Remote South Australia.


Toll Logistics Government & Defence required a fully operational accommodation camp to be mobilised in a remote location in South Australia. Given the challenging conditions and tight deadline, Australian Temporary Structures was engaged to deliver a complete, self-sustaining rapid deployment project camp solution that could be installed and ready for use within just 10 days.


Camp accommodation
Rapid Release Accommodation Units

Project Overview


  • Location: Remote South Australia

  • Deployment Timeline: Fully operational in 10 days

  • Primary Use: Temporary accommodation and mess hall for defence and logistics personnel

  • Customisation: Fast-deploying modular structures with full amenities

 


Remote Camp
Defence Camp Accommodation

Key Features & Customisations


  • 15m x 15m Mess Hall Structure – A spacious, climate-controlled area for dining and communal activities.

  • White Vinyl Roofs & Walls – Provides durability, weather protection, and insulation for extreme conditions.

  • Framed Glass Walls – Enhances natural light and visibility, creating a comfortable dining environment.

  • Cassette Flooring – Lay of the Land – Adapted to the natural terrain for a stable and even foundation.

  • Lighting & Air Conditioning – Ensured a comfortable indoor environment, essential for personnel working in remote conditions.

  • Trestle Tables & Chairs – Provided seating and dining arrangements for the personnel stationed at the camp.

  • Stainless Steel Benches for Food Service – Installed for efficient meal preparation and serving.

  • 26 Rapid Release Units – Highly efficient accommodation units, deployable within 10 minutes by just two installers, enabling a fast and scalable setup.


Project Success


The Toll Logistics Government & Defence Accommodation Camp Project was a major success, with full deployment and operational readiness achieved in just 10 days. The high-speed setup, climate-controlled infrastructure, and practical design ensured that personnel stationed in this remote location had comfortable accommodation, dining, and essential living facilities.


This project highlights how ATS emergency relief structures can provide rapid-response, fully-equipped accommodation camps, catering to defence, logistics, and emergency operations in remote and challenging environments.