There’s no question the education sector is expanding rapidly. It needs more space, higher functionality, high-quality construction, and lower costs. Even just upgrading older buildings can be extremely expensive. That is why the people responsible for school construction budgets want better options. They need to get better value for money and cover all the angles regarding their new space needs.
14 MOST POPULAR SCHOOL BUILDINGS IDEAS:
TAFE Workshops
Science Labs
School Classrooms
Playground Shelters
Gymnasiums
Dance Studios
Office buildings for permanent administrative offices.
Music Rooms
Dormitories
Cafeterias
Locker rooms
Toilets amenities
Childcare Centres
The combination of purpose-built spaces and exceptional flexibility in design makes all the difference. Our buildings are not one size fits all. Our clever designs range from modern, transportable classrooms to innovative multi-storey semi-permanent buildings that provide schools with the flexibility to expand or contract in size as the needs of the school change.
Modular Classrooms
With constantly changing demographics and the need for specialised areas, even a well-managed school can be thrown into an immediate need for additional space. To meet the rapid growth of the education market, ATS can provide one and two classroom buildings, to custom multi-class complexes on school campuses. Portable buildings are the smart solution to your changing education needs. Australian Temporary Structures can bring you cost-effective, quality space on a tight schedule … so you can keep your school and your students working at their highest potential with the least amount of disturbance.
Our comprehensive list of construction services includes:
project design
site work
construction
building commissioning
and financing with rental, purchase or buy back options
Turnkey service
Throughout the process, we’ll work closely with you to determine your specific needs for your school project. Our experienced design and operations team are highly skilled and will be on hand every step of the way as part of the full turn-key solution we offer. From preparing the site for installation, plus onsite delivery and installation. By having a quick construction period, it means minimal disruption to the school calendar. Once the buildings have been erected on campus, they are operational and ready for students and teachers in a fraction of the time. Whether you are looking to build a temporary transportable school or a larger permanent education facility, our team is equipped to handle your needs.
Opmerkingen